EDIT - Now a 'work at the local school' mum a few days a week while juggling the job of parenting 3 teenagers! I am a SAHM who does work from home occasionally, dedicated to raising 3 Godly, independent, healthy children. Loving the home building process though it is not without challenges. I have fairly free reign over the creative aspect of the project...just not the financial side!
Showing posts with label drainage. Show all posts
Showing posts with label drainage. Show all posts

Wednesday, July 3, 2013

An exciting screenshot

I love this one! It shows us what is going to occur in the next 2 weeks if everything goes according to EBH plans. Doors, stairs, waterproofing and even the start of the kitchen installation.

For those interested to know (Niall), I heard back from Troy about the frame inspection report from H&K Ryan. He emailed it back to me and had signed/dated each of the items fixed.

I had also asked Troy if anything could be done with the drainage issue on the north side of the house. The frame report from H&KRyan seemed to indicate that it could be an issue...

Surface Water Drainage: The retention of water from surface run off could have an effect on this dwellings foundation material which in turn could affect the slab to this house inspected.
Best practice is to monitor the flow of surface water and stormwater run off and have the water directed away from the house and then into storm water pipes by a qualified and licensed Plumber & Drainer.
Subject to this Builder’s contract specifications as to what is being allowed for by the way of surface water drainage, (Reference: AS: 2870 Appendix B, B2.3 (a) for site drainage requirements.) 

Troy seems to think that there is not an issue with the water...
"Re drainage, unfortunately we can't have any one go in to do any work as you know. Given the recent weather, there is some water sitting around. The house is on piers of uniform bearing, so the water won't affect the structure"

Monday, July 1, 2013

A hive of activity today

The sun is shining bright and is expected to all week. GREAT, on account of the house being built and also the school holidays. There were a few tradies at the house today. I noticed that the sparkies had been to change the wiring in the entry way. We changed from wall points to light points at great cost. AJ from re-do my space has plans to install 2 of something like this on the wall just in the entry foyer with a console.


We also agreed to have 2 light points on either side of the house in lieu of the 2 downlights that we cannot have (see previous post)

I noticed today that the insulation has been installed at some stage recently. The photo here is not very clear from my boundary position.


Many guys were delivering copious amounts of gyprock today. The electrical company told me last week that it was due for the start of installation on Tuesday. Actually, you can probably see the insulation better in this photo.


The recent downpours of rain have again highlighted our drainage issue on one side of the house. Given our landscapers don't have access until after settlement, I don't think there is much we can do. I am sure that it doesn't make it easy for the builders nor is it possibly doing good things to the slab.