EDIT - Now a 'work at the local school' mum a few days a week while juggling the job of parenting 3 teenagers! I am a SAHM who does work from home occasionally, dedicated to raising 3 Godly, independent, healthy children. Loving the home building process though it is not without challenges. I have fairly free reign over the creative aspect of the project...just not the financial side!
Showing posts with label HnK Ryan. Show all posts
Showing posts with label HnK Ryan. Show all posts

Thursday, October 10, 2013

We have a date...

....with Eden Brae Homes to make our final payment and collect our keys.

MONDAY OCTOBER 21 in the morning

A little disappointed that it couldn't be Friday afternoon to give us the weekend to 'play' in it. It probably comes down to availability to meet onsite too.

The last week has been full steam ahead with PCI, purchasing decorating items, loan settlement, insurances, tying up loose ends and creating other loose ends, on top of being sick and looking after other sick family members. A few more dates have been booked in to the schedule  - Shutter/blinds installation October 15 and appliance installation on October 16.

I received an email this morning from EBH informing me that our cooker is out of stock but that they are happy to offer us an upgrade. A Google search revealed nothing on this upgraded cooker so I rang Baumatic in VIC just to ensure we were getting at least a similar product. This cooker has extra capacity and triple rather than double glazed door. I approved the upgrade!

The private certifier has completed his inspection for the occupancy certificates. We have some items that need to be completed
 FOR INTERIM OCCUPATION CERTIFICATE
 1.       Provide a copy of the engineers certificate for glass balustrades confirming that the design complies with AS1170.1 & AS1288-2005
2.       Submit compliance certificates
3.       Site Cleanup
 FOR FINAL OCCUPATION CERTIFICATE
 1.       Comply with condition 23 with reference to retaining walls
2.       Comply with condition 21 with reference to vehicular crossing
3.       Comply with condition 20 with reference to driveway installation
4.       Repair/Reinstate damaged footpath 

None of these items seem to be an issue so the certificates should be fairly easy to access.

HnK Ryan has completed their re-inspection which marries up fairly nicely with our PCI inspection report. Troy has indicated that most items identified by the independent inspectors will be fixed anyway but I will use this report as the basis for our 90 day maintenance inspection.

Tuesday, October 8, 2013

PCI completed

Today seemed to go remarkably smoothly despite feeling under the weather with a virus. I had spent the previous 24 hours in bed. I went armed with checklists for each & every room, a torch, charger to test power points, cloth to wipe surfaces, the contract, variation sheets etc and of course, I used none of it! Troy was so thorough in his checking of the work. Most of the work to be done is paint/plaster work. Tyrrells and Howard Ryan are both re-inspecting tomorrow. All items noted, together with the items of the independent inspectors will be rectified prior to settlement. At this stage, it should be by the end of next week (7-8 working days). It will be a great way to end my birthday week.




Kids study

Media

Laundry cupboard where they have fixed up shelving

2 VERY happy girls

A fuzzy powder room vanity

Laundry

Adults study

My lovely linen cupboard


Bedroom 1

Another angle - the walls look green?

Ensuite bathroom

Main bath

Main bath

Main bath

Main bath

Fuzzy upper hallway

Thursday, September 19, 2013

The good, the bad and the downright ugly!

I promised that this blog would show all sides of the build to assist others in their journey to build a house. Well, whilst I was expecting there to be issues that arise from the independent inspections especially painting, I didn't think there would this MANY. They do seem relatively minor to my untrained eye and not structural. I think PCI is further away than what I thought it would be :-( HnK Ryan's report came through last night and left me feeling fairly deflated or even more deflated than my headcold and house selling is already. I haven't posted all 25 pages of the report but a sample of the photos documenting the issues. 









Brad & I have decided to reengage the services of our independent inspector to return & make sure issues have been fixed satisfactorily - peace of mind for me. (And this is by no means a reflection on our SS, Troy. It is the trades that EBH get to subcontract that are not showing pride of workmanship)

Wednesday, July 3, 2013

An exciting screenshot

I love this one! It shows us what is going to occur in the next 2 weeks if everything goes according to EBH plans. Doors, stairs, waterproofing and even the start of the kitchen installation.

For those interested to know (Niall), I heard back from Troy about the frame inspection report from H&K Ryan. He emailed it back to me and had signed/dated each of the items fixed.

I had also asked Troy if anything could be done with the drainage issue on the north side of the house. The frame report from H&KRyan seemed to indicate that it could be an issue...

Surface Water Drainage: The retention of water from surface run off could have an effect on this dwellings foundation material which in turn could affect the slab to this house inspected.
Best practice is to monitor the flow of surface water and stormwater run off and have the water directed away from the house and then into storm water pipes by a qualified and licensed Plumber & Drainer.
Subject to this Builder’s contract specifications as to what is being allowed for by the way of surface water drainage, (Reference: AS: 2870 Appendix B, B2.3 (a) for site drainage requirements.) 

Troy seems to think that there is not an issue with the water...
"Re drainage, unfortunately we can't have any one go in to do any work as you know. Given the recent weather, there is some water sitting around. The house is on piers of uniform bearing, so the water won't affect the structure"

Tuesday, June 25, 2013

Frame inspection

We received our 'independent independent' inspection report yesterday. Some minor things to rectify at this stage. Well worth the money for our peace of mind.