About Me

My photo
EDIT - Now a 'work at the local school' mum a few days a week while juggling the job of parenting 3 teenagers! I am a SAHM who does work from home occasionally, dedicated to raising 3 Godly, independent, healthy children. Loving the home building process though it is not without challenges. I have fairly free reign over the creative aspect of the project...just not the financial side!

Thursday, July 25, 2013

A teaser....

Tomorrow's post will contain loads of photos. I am meeting Troy on site tomorrow to check out the progress and the kitchen handles. I am hoping that I will have time to wander around and shoot away. Maybe I can give AJ (re-do my space) those honours whilst I talk to Troy.
The stackstone on the front portico has been started and whilst it looks good, it is darker or 'dirtier' than I thought it would be. Photo to come tomorrow.
I also sent a message to the Wardrobe World installer today as directed by their head office. I am keen to find out the cost to add some more drawers to the wardrobes - 2 is not enough and it seems our wardrobes are too shallow to accommodate any stand alone shelving.



Wednesday, July 24, 2013

Kitchen handle update

 The news has come back from EBH that nothing can be done at this time with the handles.

"Unfortunately I don’t have good news for you. All cabinets, doors and drawers have been installed with the square handles (0115154). As you have found, this is as per the colour selection. The handle that you wish to change to (9112637), will not suit the holes that have been drilled. To change the handle, new doors would need to be made. You may consider changing this after settlement."

Whilst I understand that it was partially my mistake and we signed off on it, there is a part of me that is a little disappointed at the mistake that was made in the first place by the HOG consultant who confesses that she is 'not very good with numbers & letters' or in the words of another blogger 'a self-diagnosed dyslexic'.

One of my fellow Home One members who has both types of handles in his kitchen feels that we can definately do something in the future to rectify the situation even if it means contacting the kitchen supplier to assist. He also had errors in his HOG colour selection sheet.

WARNING to those about to embark on the journey - take photos of everything you select WITH codes visible to assist with crosschecking later down the track. Part of our problem was that we selected our products in July 2012 and didn't receive the final paperwork until January 2013.

Monday, July 22, 2013

Kitchen handle potential disaster

  
Photo courtesy of fellow EBH bloggers Anne & Alok
It has come to my attention over the weekend that we are going to have an issue with our kitchen cupboard handles. I went back to our paperwork and discovered that I had overcorrected a mistake made by Home Options Gallery in the final paperwork. When we received our colour selection sheet, we realised that the incorrect bathroom vanity handles were recorded and alerted our consultant. She changed this manually on our sheet and assured us that it would make it's way onto our final documents. Of course when our final documents came through, they were still incorrect. I changed them to what we had selected (the square ones pictured second from the bottom) but also accidentally overcorrected and changed the kitchen ones to these as well. I am sure they are going to look 'wrong' in the kitchen. At this stage, I am not sure whether they have been added to the cabinets or not. I have Eden Brae looking into the situation for me and i have requested a site visit to check it all out. If they have already been attached, we may have problems with screw holes :-( If only an error had not been made in the first place......

Tuesday, July 16, 2013

A few exterior photos

I need to keep the interest level up. Without inside access, I can only provide outside photos at the moment. It seems that there is no work happening onsite at the moment unless it all happens before 8:30amish (my first driveby)
Waterproofing was supposed to occur yesterday with certification today. Only action on site was watching Troy carry some things to his ute LOL. The kitchen cabinets are scheduled to arrive today but that has obviously been delayed.
Photos for you.....
Garage door is down for viewing

Front on view

Part of the new decorative corbel installed - more to come above stackstone

Another angle - unfortunately the portaloo has been moved to be in the way

Saturday, July 13, 2013

Front door is in


And a beautiful aqua colour they are...for now. It will be painted a deep grey colour soon.

Thursday, July 11, 2013

A quick spontaneous inspection....

....but sorry, no photos! I made a visit to the house this afternoon to see if I could take photos from outside. The carpenters were still there and so was Troy. After a chat, Troy offered a quick run through the house before he had to leave to go elsewhere. Happy to!
It was great to see the gyprock on, cornices, some doors on, stairs installed etc. Gives a better idea of the size of rooms. Other things noted include
* The garage door is on but hidden out of view
* The laundry cupboards are amazing - LOVE!
* The lowered ceiling in the powder/mud area doesn't look too bad really
* I really don't like the airconditioning box in Bed 3 :-(
* The decorative corbel has been taken off and half of it replaced.
* The wardrobes for the children do not seem very deep at all (450mm)
* The manhole has had to be moved to Brad's WIR due to a roof truss being in the way.
* Bricks can be left for us to use for landscaping
* The noisebatts and soundcheck gyprock has been installed between BED 1 and BED 2.
Troy confirmed that all is still on track for work to progress as per the latest screenshot.