It was a good news day today. I drove past the block and noticed the foreman there working in the hole. I stopped to chat to him about progress and he informed me that it should all be finished by Tuesday now (not next Friday) as the concrete spray is booked in for then. In preparation for this, he was doing the preplumbing and the lighting. Peter let me know that he changed the lighting from the plan from the right hand side to the left hand side (usual position). From the house, yard & alfresco, you want the ambient glow of the lighting in the water not looking direct at the lights. Fine by me!
I asked him about the mountain of fill to the side of the hole as we have already paid for fill removal (including the rocks). Peter told me that this is fill for EBH that we asked for. I had assumed that all the fill had rock so all of it was to be removed. Hopefully that will save us about $5K in additional fill that EBH will require!