EDIT - Now a 'work at the local school' mum a few days a week while juggling the job of parenting 3 teenagers! I am a SAHM who does work from home occasionally, dedicated to raising 3 Godly, independent, healthy children. Loving the home building process though it is not without challenges. I have fairly free reign over the creative aspect of the project...just not the financial side!

Wednesday, June 19, 2013

Current home's plans

Main floor

Converted garage to rumpus room plus study


Found these in the BIG cleanup. Our house is a Dainton Gough special from the 1970's. Many special handyman projects have been completed on it by the previous owner who thought he knew what he was doing ;-)

Tuesday, June 18, 2013

Building variation

Last week I was sent a Building Variation to the contract by my CSO following my aircon site meeting with Troy. I returned the variation to be amended as it did not include the lowered ceiling solution for the ground floor. When it was emailed back to me, the height of the ceiling was recorded at 2300mm rather than the 2400-2450mm discussed on site. Not happy with that, Rania suggested I call Troy to clarify. Troy said that he would ensure the best possible scenario for me regardless of what was on the piece of paper.
By the way, when I asked him about yesterdays 'no show' he said he only found out in the afternoon that the electricians hadn't been there. It doesn't explain why he wasn't there or why he didn't respond to my messages.
On site, there was a fair bit of action but I just don't know what!! Up to 4 utes there and working until at least 3:30pm. From the fence line, everything looked the same!

Monday, June 17, 2013

A disappointment!

Last week when  I met Troy on site to discuss aircon issues, he told me that electrical roughin was booked for Monday. We organised for us to meet mid-late Monday at a time to be arranged to go through with my interior designer as per my plan - there is a note on the plan that we are to still advise on placement of some powerpoints.
I sent a message to Troy on Friday suggesting 11am - no answer; sent another message this morning at 8am confirming 11am - no answer; AJ and I turn up to the site and there were no tradies and no Troy. Disappointing that I have paid that money for AJ to come and advise and we have no access and nothing to do. Just as well she is worth it ;-)

Sunday, June 16, 2013

Highly recommended product.....

http://www.aussieskipbags.com.au/

Wow! The customer service is impeccable.  In clearing out our current home, I needed somewhere to DUMP 11 years worth of stuff that we no longer need. I had heard about this company from others on the forum I frequent. I thought it was worth a go rather than having a metal skip bi sitting on the driveway and paying for its hire.
I logged my request at 12pm one day and it was on my doorstep by 3pm the same day. I easily filled it up and yesterday logged a pickup. It suggests a 5 day turnaround but at 1pm today the truck was here to collect the bag.
The only issue I had was of course, my bag wasn't big enough!!

Friday, June 14, 2013

Photos of the rear of the house

Again, my lovely neighbour has pointed his camera over his fence to take photos for us. Looks like the cladding at the back is still to be installed.
Nearly half way with the pool levels. A little chlorine and we'll be right!










Thursday, June 13, 2013

Lower roof completed





Lower roof done today. Most of it is out the rear of the house which is a no access zone  - sorry, no photos.
I received my Building Variation today for the airconditioning changes to be made as per yesterdays visit. One half of it (the ground floor ceiling height change) was left off the paperwork. I alerted Rania who will amend this Variation before I sign it.
Howard Ryan called today to finalise his independent inspection time and payment for next Thursday late afternoon. He does this first inspection prior to internal linings/lockup.

Wednesday, June 12, 2013

Vanity idea??!!



I met Troy on site today but forgot to ask him if Eden Brae can get our vanities hooked up like this. I heard they also come in white! Cool idea.

I met Troy to discuss some issues with airconditioning. At the plumbers/Troy's suggestion earlier, we moved the hot water service to the media room wall to help with efficiency. In fact, it was moved to the family room external wall right where the outdoor airconditioning unit is to be positioned. I agreed that it was OK to be moved to the media room wall instead. In fact, we agreed it would probably be better there anyway - less noise in the area we will spend the most.
We also have a few issues with the ducting coming downstairs to the living areas mainly due to the structural changes we made. When I ask for changes and they get approved, I assumed all aspects had been looked at to ensure it works. Um NO! As of today, we will now lose a corner of BED2 for ducting and the powder room, WC and mudroom area will have the roof lowered to standard height to enclose some ducting. Not particularly happy about it but they are our best options now.

Whilst I was there, we had the airconditioning roughin happening and the roofing had started. Torrential rain saw the roofing guys shut up shop. Lockup should be in about 2 weeks time and the gyprock will begin.